98 Photos - Mar 18, 2015
Photo: Photo: Photo: Photo: Photo: Photo: THE ROAD LEADING TO CONSTRUCTION SITEPhoto: THE LEVELLED GROUND IS THE PLACE WHERE OUR MONASTERY WILL BE BUILT. JUST THE RIGHT POSITION HAVING THE MOUNTAIN AS BACKGROUND.Photo: Photo: THE ACTUAL SITE OF THE CONSTRUCTIONPhoto: Photo: THIS IS THE RIGHT POSITION OF THE MONASTERY. THE BACKGROUND OF MONASTERY IS THE MOUNTAINPhoto: Photo: Photo: Photo: HELEN AND THE CONSTRUCTION SITE MANAGER MR. DENISPhoto: BRO. JOSEF, FR. RUDY AND HELEN.Photo: Photo: Photo: HUGE ROCK TO BE REMOVED BY BLASTING.Photo: SITE OF CONSTRUCTIONPhoto: Photo: Photo: BOULDERS HEAPED AT THE SITEPhoto: Photo: Photo: Photo: Photo: Photo: Photo: HAVING A CHAT WITH DENIS AND ALLENPhoto: RED HATED ALLEN IS TECHNICAL ENGINEER...Photo: Photo: SHARING A LIGHT MOMENTPhoto: HELEN INSTRUCTING US ALLPhoto: Photo: LEVELLED AREA... THREE METRES DEEP FROM THE HILL AREA TO EXISTING HOUSE LEVELPhoto: SITE GETTING READY FOR FOUNDATION DIGGINGPhoto: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: SPOT OF THE FORMATION HOUSEPhoto: Photo: Photo: Photo: Photo: MATERIAL FOR THE FOUNDATION PLANPhoto: MATERIALPhoto: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: Photo: ANGLE OF THE SITE FROM THE EXISTING HOUSEPhoto: Photo: FROM THE HOUSEPhoto: Photo: ROAD TO THE SITEPhoto: THE SPOTPhoto: Photo: