Post has attachment
Please ensure you are using the moodle site as requested last week to research and revise for your materials and hardware exam.
All information needed to pass the exam can be found on the moodle site :
CGLI 2675 - level 2 Diploma in Engineering ---- Topic 3 - Unit 013 Fundamentals of Aircraft Materials & Hardware.
Please open all available files and revise each session.
Pay particular attention to the revision checklist. ( I have screen shot the revision checklist document below)
Please put the hard work in , which is required to pass this exam. No excuses.
Thanks Chris
Photo

Post has attachment
Anchor nut instillation - pitch of anchor nut correctly drilled using a anchor nut drill jig , anchor nut pinned in to position then attached to the aircraft structure using blind river ( avdel river )

Post has attachment
Wire locking - failsafe

Post has attachment
Drilling anchor nut pitches using the correct drill jig

Post has attachment
How to instal avdel rivets

Post has attachment
Today's session we will be discussing aircraft hardware ( bolts , nuts ,rivets , washers , and locking devices . Please view the following clips to enhance your learning.

Post has attachment
Secondary failsafe - nut locking.

Post has attachment
One of many ways of removing a Hi- Lok collar, for maintenance purposes

Post has attachment
How to install cherry max rivets ( blind rivets )

Post has attachment
Wire locking a turn buckle / barrel
Wait while more posts are being loaded