Post has attachment
We just had a 2002 model come back for a service after more than 10 years all it needed was some hydraulic seals and some TLC and off it  went back out drilling.

Post has attachment
New B250 Pilot Tube Microtunneler goes to contractor in Sydney. The B250 is ideal for installing small bore sewer pipes in soft ground conditions.
Photo

Post has attachment
Another B06 Bedborer just delivered to Sydney.  The contractor has won a large water upgrade job and is planning to use the B06 to install water services across roadways in hard clay and Shale ground conditions.  These conditions would usually be very challenging for pneumatic boring tools.
Wait while more posts are being loaded