Post has attachment
A New Ground Floor Office Glass Partition installed by Barnes Interiors. System 8000 with Full height glass walls and Barcode Manifestation.
Photo
Photo
2/4/16
2 Photos - View album

Post has attachment

A Project that Barnes Interiors were involved with from the start. A Project that took 6 Months to complete and had a full Refurbishment.

At Barnes Interiors we undertook the work of all New ceilings and walls, All new doors and door frames, New skirting and New bulkheads to cover the services.
PhotoPhotoPhotoPhotoPhoto
2/1/16
9 Photos - View album

Post has attachment
A small project carried out at AES Removing their fully Glazed Partition walls and re-building them in there New position. A great job carried out by Barnes Interiors Ltd
Photo
Photo
1/11/16
2 Photos - View album


Our Christmas opening hours are:
24th Decemeber 8am - 1pm
25th Closed
26th Closed
27th Closed
28th Closed
29th Closed
30th Closed
31th Closed
1st Jan Closed
2nd Jan Closed
3rd Jan Closed

Office will Re open on the 4th January

Post has attachment
System 8000i is a fully glazed flameless partitioning system that combines design aesthetics with outstanding performance, it offers the opportunity to create partitioning without vertical mullions to a maximum height of 3000mm.

It is available in both Single Glazed and 105mm Double Glazed.
PhotoPhotoPhotoPhoto
11/24/15
4 Photos - View album

Post has attachment
The installation of glazed and solid partitioning including full height glass doors, seamless glazing with manifestation.

System 8000i is a fully glazed frameless partitioning system that combines design aesthetics with outstanding performance, it offers the opportunity to create partitioning without vertical mullions to a maximum height of 3000mm.
PhotoPhotoPhotoPhoto
11/24/15
4 Photos - View album

Post has attachment
Converting an existing classroom into the “Bloomberg Financial Market Laboratory” for training in financial markets. Including designer flooring, decoration, electrics, wall cladding with inset to monitors, bespoke entrance canopy with LED lighting and live feed ticker-tape display and automatically operated, fire rated entrance doors.
PhotoPhotoPhotoPhoto
11/24/15
4 Photos - View album

Post has attachment
Installation of partition and ceilings to four floors, including bespoke design feature ceilings to Director suites.
PhotoPhotoPhotoPhoto
11/24/15
4 Photos - View album

Post has attachment
This 4-week project was to supply and install full height frameless glazed partition with full height glazed doors, all with the DDA regulated frosted manifestation.
Photo
Photo
11/24/15
2 Photos - View album

Post has attachment
PhotoPhotoPhoto
11/24/15
3 Photos - View album
Wait while more posts are being loaded