Post has shared content

Post has attachment

Post has attachment

Post has attachment
Sir we had reports of frequent power outages at several SCP sites. in California. Engineers tried to fix it but failed. The only solution is to turn on SCP 079 but it turns out, the solution is temporary and only lasts for 45 minutes. Dr. Clef says that if something is not figured out, the SCP sites will be terminated, and the workers will have to be forced to work in a different site.
Photo

For people who are new here, Welcome to the SCP Department of Engineering and technical service. Any problems or anything else that goes wrong with the electrical services, Engineering and technical Service Department-SCP F is always here. (just wanted to added a greeting to the people who might join xD.)

though it say it was made from him it was really me
Wait while more posts are being loaded