Profile cover photo
Profile photo
SBS Group Framing Solutions Melbourne
3 followers -
Build Smarter with SBS Group
Build Smarter with SBS Group

3 followers
About
SBS Group Framing Solutions Melbourne's posts

Post has attachment
The Smart Hob system has been in action since 2003 - almost 15 years of using the prefab system for an easier, smarter and faster hob formwork alternative! http://ow.ly/5yQB30dNq5f
Photo

Post has attachment
Installation of SBS Smart Frame roof trusses now underway at Mornington Aged Care...lightweight frames shop detailed and pre-fabricated to site specifications for BUILD SMARTER on site construction. http://ow.ly/lmMM30dLH13
Photo

Post has attachment
A life-saving operation inspired one of our design technicians to nominate The Royal Children's Hospital Foundation for our monthly donation. Read the story here: http://ow.ly/7u9U30dJR45

Post has attachment
From Concept to Completion - 6 projects using SBS pre-fabricated framing solutions as featured in our latest Build Smarter Update video. Check out the 3 min video here > http://ow.ly/J8BA30dHQYq
Photo

Post has attachment
Empire, MY80, Lighthouse and Victoria One - 4 iconic Melbourne projects over 20 levels using the Smart Hob system for an easier, smarter and faster hob formwork alternative! http://ow.ly/Ccj030dHPWH

Post has attachment
Another delivery of SBS Smart Frames for the Bannockburn Primary School pods.
Design, shop detailing, CAD modelling and manufacture of the lightweight frames by SBS Group.

See our latest projects in progress by watching The Build Smarter Update video > http://ow.ly/bmox30dCpKI
Photo

Post has attachment
SBS design technicians at work: shop detailing and 3D CAD modelling underway for Melb Jet Base Soffit Panel and Truss Framing.
Photo

Post has attachment
SBS design technicians at work: shop detailing and 3D CAD modelling underway for Melb Jet Base Nose Cone Framing.
Photo

Post has attachment
Designed by SJB Architects and under construction by Icon Co, one of Wyndham Harbour's latest projects, The Lighthouse will add 137 apartments over five levels to the marina.

Prefab steel hob formwork frames were manufactured to site specs for this project for a faster solution to the conventional forming up of timber ply.
What is the Smart Hob system and why should you use it? Find out here > http://ow.ly/FoBZ30duuMo
Photo

Post has attachment
Our latest Smart Hob Case Study - featuring 288 Albert in Brunswick.

Over 800 L/M of Smart Hobs were used on this 14 level project, replacing the conventional on site construction of timber hob formwork. Check it out here: http://ow.ly/h8dl30dqf5x
Photo
Wait while more posts are being loaded