Profile

Cover photo
Amit Karmalkar
Attended Devi Ahilya Vishwavidyalaya
Lives in Mumbai
56,237 views
AboutPostsPhotosVideos

Stream

Amit Karmalkar

Shared publicly  - 
 
Great write-up. Thanks. 
 
L+72 to L+73: Logbook

Today is Saturday and, wow, this has been a busy week! Not so much time to keep you updated on our work and life up here, unfortunately. But hey, we can still catch up a little bit, so let’s see what’s happened on the ISS earlier in the week.

This past Tuesday I did something that we don’t quite do every day: I depressurized a part of the Space Station to vacuum. Not an airlock, those actually exist for that purpose.

A vestibule: that’s the small volume that is created when two ISS modules are joined together. Just like if in your home you had not one door between rooms, but two, with a little space between them which becomes a little “room” of its own if you close both doors. On ISS we call that little volume between hatches “vestibule”.  Imagine you wanted to make sure that both those hatches do not leak – the best way to do this leak check is to depressurize the vestibule between them. If air gets into the vestibule, raising the pressure, there’s a leak in the hatch seals. Here is how it goes: you connect the vestibule volume to a vacuum access point and vent all the air overboard; then you measure the residual pressure, which will be very close to zero (in my case it was about 3 mm Hg) and then you wait 24 hours and check the pressure again. Of course, there is no such thing as a perfectly tight seal, some leakage will always occur.

In the case of the vestibule, my procedure called it a good leak check if the increase in pressure in the vestibule after 24 hours was less than 5 mm Hg.
I bet you’re curious by now… what hatches did we leak check and why? Well, I’m not sure if you’ve heard already, but we’re going to do some remodeling soon on the Space Station. Time to freshen up the room distribution a bit! Our PMM module, which is currently attached to Node 1 nadir, will be relocated to Node 3 forward and the Node 1 nadir port will get a luxury upgrade that will make it capable of receiving visiting vehicles. So we did the leak check on the vestibule between PMM and Node 1, to make sure that those hatches do not leak, because they will be exposed to vacuum when we do the relocation later this year. In addition, just before the leak check Terry and I installed a feedthrough: that’s something that allows a cable connection to go through a hole  in the pressure shell – you plug the cable on one side, let’s say inside, and then you plug the continuation of the cable to the other side of the feedthrough, let’s say outside. The feedthrough is inserted in a hole and has seals to make sure air doesn’t leak out.

You’ll be happy to hear that the vestibule passed the leak check, so both the hatches and the newly installed feedthrough are in good shape. Good news, ah? By the way, what you see in the picture is the long jumper hose that we used to connect the vestibule to vacuum: it had to reach all the way across the Lab to the vacuum access point. Maybe it’s just me, but connecting something to vacuum is definitely something that commands attention: there’s nothing particularly complicated in the setup to depressurize the vestibule, but I did double-check and triple-check it before opening the equalization valve that actually vented the vestibule atmosphere into space. In fact, I even had a feeling for a moment that my ears were popping, which would be a sign of the pressure in the cabin dropping; but the pressure indications were stable, so it was probably the hissing sound from the ongoing venting playing tricks on my eardrums.

Wednesday was one of those “keep-the-Station-in-shape” kind of days for me. Besides tearing down the leak check setup, I worked for example on an a periodic environmental monitoring activity that checks our potable water for coliform and other microbial growth in samples from our potable water lines after 48 hours of incubation. Luckily, I could report zero microbial colonies on the microbial capture device and no magenta color in the coloform detection packet, indicating a negative result. Always good to have confirmation that our drinking water is safe!

Futura mission website (Italian): Avamposto42
avamposto42.esa.int

  #SamLogbook #Futura42  

(Trad IT)  Traduzione in italiano a cura di +AstronautiNEWS  qui:
http://www.astronautinews.it/tag/logbook

(Trad FR) Traduction en français par +Anne Cpamoa  ici: https://spacetux.org/cpamoa/category/traductions/logbook-samantha

(Trad ES) Tradducción en español por Carlos Lallana Borobio aqui: http://laesteladegagarin.blogspot.com.es/search/label/SamLogBook

(Trad DE)  Deutsch von http://www.logbuch-iss.de
61 comments on original post
1
Add a comment...

Amit Karmalkar

Shared publicly  - 
 
 
Be Ready !! He is On His Way to Mumbai

Visit Ganeshji at Below Listed Top Mandals Of Mumbai (August)

DETAIL : http://www.mumbai77.com/city/2422/festivals/top-and-famous-known-ganesh-mandals-pandals/
31 comments on original post
1
Add a comment...

Amit Karmalkar

Shared publicly  - 
1
Add a comment...

Amit Karmalkar

Shared publicly  - 
 
Navratri Utsav. 
2
ramesh anusha's profile photo
 
what a girl whant
Add a comment...

Amit Karmalkar

Shared publicly  - 
1
Jabarullah Ems's profile photo
 
Sweety beueaty supper news wondarful exaland fantastic picture baiii 
Add a comment...

Amit Karmalkar

Shared publicly  - 
1
Add a comment...

Amit Karmalkar

Shared publicly  - 
 
 
Happy Ganesh Chaturthi
May Lord Ganesha remove all obstacles and bring you & your family a lot of Happiness and Prosperity. 

गणपती बाप्पा मोरया ! मंगलमूर्ति मोरया ! 

#ganeshchaturthi   #india   #ganeshchaturthi2014  
 ·  Translate
197 comments on original post
1
Add a comment...

Amit Karmalkar

Shared publicly  - 
1
Add a comment...

Amit Karmalkar

Shared publicly  - 
 
Just bought it. Will install very soon. Hope this should help a lot. 
1
Add a comment...
 
I won candy on the #googlebirthday doodle! Score: 92
1
Jabarullah Ems's profile photo
 
Sweety beueaty supper wodarful beueatyful exaland fantastic good happpy news beueatyful picture baiii 
Add a comment...
 
Many Happy Returns of the day.
 
Indian Prime Minister Dr Manmohan Singh turned 81 today.

It was a dull birthday for the reluctant birthday-celebrator and he avoided cutting a cake in the wake of recent terror attacks.

Visit www.india.com to read more.
1 comment on original post
1
Jabarullah Ems's profile photo
 
Sweety beueaty supper beueatyful wondarful exaland fantastic happy brathday for Indian prime ministar monmohan sing happy thanks baiii 
Add a comment...
People
Places
Map of the places this user has livedMap of the places this user has livedMap of the places this user has lived
Currently
Mumbai
Links
Contributor to
Education
  • Devi Ahilya Vishwavidyalaya
    1988
  • SGSITS Indore
    1983 - 1988
Basic Information
Gender
Male