Profile cover photo
Profile photo
Energy and System Technical Ltd (East Solutions)
4 followers -
High Voltage Engineers, Independent Connection Provider, Generation Export Control, HV Maintenance
High Voltage Engineers, Independent Connection Provider, Generation Export Control, HV Maintenance

4 followers
About
Posts

Post has attachment
PhotoPhotoPhotoPhotoPhoto
20/06/2017
14 Photos - View album

Post has attachment
PhotoPhotoPhotoPhotoPhoto
15/06/2017
19 Photos - View album

Post has attachment
EAST's Stuart Claydon prepares an 11Kv endbox termination at the site of a major food producer in Norfolk.

Post has attachment
EAST have been busy building and providing the switchgear and substations at a new biodiesel plant on the Isle of Grain (pictures courtesy: Stuart Claydon)
PhotoPhotoPhotoPhotoPhoto
4/6/17
13 Photos - View album

Post has attachment
Stuart Claydon is part of EAST's team working at a major food producer in central Norfolk installing a new sub station to boost and upgrade its power supply. Here he is shown with his fine work in terminating a connection (Pics courtesy Stuart Claydon)
PhotoPhotoPhotoPhotoPhoto
4/5/17
9 Photos - View album

Post has attachment
EAST's Operations and Maintenance team of John Pearman, Nick Bond and Olly Burrage have been down in South-West Suffolk carrying out repairs and maintenance to a Solar Farm. The aim of the repairs and refresh was to increase the efficiency of the power output at the Solar Farm. EAST's expertise has enured that this has happened.

PhotoPhotoPhotoPhotoPhoto
3/28/17
11 Photos - View album

Post has attachment
Switching in North West Suffolk. EAST has been working at a new Anaerobic Digester. As part of the works we have to ensure that as new cabling is installed at the plant, it is done in a safe environment that means that work can be carried out with a both a minimum of disruption but at the same time correct procedures are followed to eliminate risk from the process. Here EAST's Neil Bracey oversees the process from beginning to end.
PhotoPhotoPhotoPhotoPhoto
3/21/17
8 Photos - View album

Post has attachment
The East team were busy out in poor weather changing a transformer for a leading manufacturing company in Norwich this week.
PhotoPhotoPhotoPhotoPhoto
03/02/2017
5 Photos - View album

Post has attachment
EAST's Technicians on a jointing course to further improve their skillset. EAST put a great emphasis on training for all our employees and we see it as a great investment in our current and future success.
PhotoPhotoPhotoPhotoPhoto
23/01/2017
6 Photos - View album

Post has attachment
One of the most important things that needs to happen when a business park is expanding is getting safe, reliable power to new businesses.
EAST have recently been working on a site in West Suffolk to put in a transformer and connecting it to the Grid. In addition equipment had to be put in to monitor the supply to each individual new unit.
The EAST team were out until late last Friday evening finishing the installation.