Profile cover photo
Profile photo
Bulley & Andrews
15 followers
15 followers
About
Bulley & Andrews's posts

Post has attachment
Bulley & Andrews enjoyed another exciting “win” for the faithful restoration of the Chicago Athletic Association. B&A, along with team members HPA, KJWW, and Forefront Structural Engineers, received the top prize as ENR named the Chicago Athletic Association Hotel the “Midwest Project of the Year.” The honors were announced at an industry breakfast on Wednesday, November 30th.

Selected from nearly 100 entries, a panel of industry judges selected the project based on its high level of achievement in creative design, innovative construction techniques, craftsmanship and strong safety record. Additional details on this extensive renovation and restoration effort can be found here:
http://www.enr.com/articles/40881-midwest-project-of-the-year---chicago-athletic-association-hotel


Post has attachment
Bulley & Andrews is excited to announce our partnership with Cordogan Clark & Associates and the Community Consolidated School District 181 on the new Hinsdale Middle School. Plans for the new, 3-story, 133,900 SF middle school project ensures ample space for projected enrollment, and a design that meets the standards for a high quality, 21st century educational environment.

https://www.youtube.com/watch?v=kE3-fHB3XiY



Post has attachment
The Chicago Athletic Association Hotel was recently awarded the Driehaus Award from the National Trust for Historic Places during PastForward 2016 in Houston, Texas. Congratulations to the project team on this recognition.

https://www.youtube.com/watch?v=mG9W9FofiTI

Post has attachment
Bulley & Andrews took home BuiltWorlds' Episode of the Year award for The Yard at The Chicago Shakespeare Theater. The video showcases the project's newly constructed theater, which is one of the most advanced theater spaces in the world. B&A is currently serving as construction manager, partnering with architect, Adrian Smith + Gordon Gill on the theater transformation.
Photo

Post has attachment

Constructing a space clean enough to search for light from the beginning of the universe is no simple task. Bulley & Andrews is serving as general contractor for Argonne National Laboratory's new Cleanroom. Learn more about the highly technical project here:

http://www.newswise.com/articles/building-a-room-clean-enough-to-make-sensors-to-find-light-from-the-birth-of-the-universe

Post has attachment

Post has attachment
Take a behind the scenes look at The Yard at the Chicago Shakespeare Theater with BuiltWorlds' Project Innovation Series. Bulley & Andrews is serving as construction manager on the new theater project at Navy Pier.

Post has attachment
Learn how adaptive reuse played a role in the final stage of Bulley & Andrews' new headquarters project.

Post has attachment
Congratulations to the Chicago Athletic Association Hotel, selected as one of three finalists for ENR Midwest Project of the Year. ENR Midwest recognized the CAA Hotel as Best Project in Renovation/Restoration for 2016 and will announce Project of the Year November 30th.
http://www.enr.com/blogs/10-midwest-musings/post/40381-the-best-in-the-midwest-and-the-project-of-the-year-is

Post has attachment
With a new lobby and an array of amenities, tenants of the freshly renovated Fifth/Third Center at 222 South Riverside Plaza may not feel like they are headed to the office.
Wait while more posts are being loaded