Profile cover photo
Profile photo
FEG Ltd.
2 followers
2 followers
About
Posts

Post has attachment
FEG Move to New Office Facilities

FEG Ltd have moved to new office facilities in Washington -  Tyne and Wear.

Chris Williams, Managing Director of FEG Ltd said: “We are delighted to announce that we have now moved to larger more suitable office facilities to accommodate our expanding team of project engineers and managers”.

“The new offices offer not only more space with our own dedicated facilities they also give us improved road and motorway links and better car parking facilities”.

Chris added: “While many of our team work onsite at clients premises across the UK providing hands-on project management services, we have grown and our engineers and support staff needed the extensive facilities that these new offices now provide. The new facilities give us the scope to provide more services and further grow our business”.

http://www.feg-global.com/news/FEG-Move-to-New-Office-Facilities.php
Photo
Add a comment...

Post has attachment
FEG Offers CDM Services to Comply with 2015 Regulations

Now that the new CDM regulations have now been made and laid in Parliament and became law on 6th April 2015, there are changes that clients need to implement when planning to extend, build or demolish buildings, including machinery modifications and installations, building works, civil and engineering works...

#ProjectManagement   #Consultancy   #DesignandBuild  

http://www.feg-global.com/news/FEG-Offers-CDM-Services-to-Comply-with-2015-Regulations.php
Photo
Add a comment...

Post has attachment
FEG - Food Processing Factory Roof Refurbishment

FEG Ltd, Specialist Design & Build, Project Management and Consultancy, were appointed as Principal Designer and Principal Contractor under the CDM 2015 Regulations for the planned roof refurbishment of a major food processing plant in the North West England.

The external works carried out at roof level were to remove the existing glazing panels and asbestos rope gaskets, all of the glazing bars, associated fixings and fillers. The operatives were protected and wore full personal protective equipment (PPE) required by law and HSE guidelines to facilitate this operation...

#projectmanagement
#engineering
#contruction
#foodindustry
#cdm2015

http://www.feg-global.com/news/FEG-Food-Processing-Factory-Roof-Refurbishment.php
Photo
Add a comment...

Post has attachment
FEG Supports Westies Captain Fiona Duff

FEG Ltd are pleased to announce our sponsorship of Westerlands Ladies AFC, The Football Club are thrilled that Captain Fiona Duff has secured sponsorship after FEG hand picked her to sponsor following an impressive season so far.

Sitting 2nd on the stats table with 6 goals, 6 assists and 3 player of the match's, there’s no denying why FEG were drawn to the Westies backbone.

One of FEG’s Projects Managers, David Banham, said that FEG Ltd has had over a 10 year history of working in Glasgow and we are honoured to sponsor such a worthy cause as Westerlands Ladies AFC. We wish them every success.”

Original story by Naomi Clark

http://www.feg-global.com/news/FEG-Supports-Westies-Captain-Fiona-Duff.php
Photo
Add a comment...

Post has attachment
Cradle to Grave Service

FEG Ltd are more than project engineers and managers – our ‘Cradle to Grave’ Service offers clients the peace of mind that throughout the Whole Life Project Cycle we provide a range of competencies covering all aspects to ensure delivery of a complete project from feasibility to handover and beyond with:

Planned maintenance schedules
Management of service contracts
Line efficiency and performance assessments

All of which reduces the pressure on in-house engineering departments.

We can also provide trade personnel to undertake finishing tasks and snagging that often get over looked on projects.

Nothing is left to chance, FEG Ltd will provide you with continuous oversight of the project leaving no ‘loose ends’– successful project completion is our project engineers and managers’ total responsibility.

http://www.feg-global.com/news/Cradle-to-Grave-Service.php
Photo
Add a comment...

Post has attachment
FEG Ltd Now Provide Flue Gas Emission Analysis - MCERTS

Air pollution control and ventilation specialists FEG Ltd provide flue gas emission analysis to assist companies comply with the UK Environment Agency's Monitoring Certification Scheme - MCERTS.

Under strict European and UK laws any UK company or organisation that has industrial chimneys, stacks, flues and exhausts from combustion plant must now monitor emissions to air. This is to help protect the environment and human health.

FEG Ltd will carry out Flue Gas Analysis and Sampling on flue systems, flue gas purification systems, industrial burners, stationary industrial engines, gas turbines and other potential sources of hazardous emissions. MCERTS makes sure that information on possible pollution released from flue stacks is reliable. It also helps improve health and safety for plant operators, worker comfort and the environment. Monitoring is carried out in accordance with monitoring methods selected from Environment Agency Technical Guidance Note: M2.

During the testing process FEG Ltd will also identify cost-effective energy efficiency recommendations for areas of significant energy consumption and can carry out Energy Improvement Projects. Whether it is Flue Gas Analysis or MCERTS, FEG Ltd has proved that a well designed and maintained installation can offer opportunities for real energy saving solutions.
Photo
Add a comment...

Post has attachment
FEG Ltd Project Management - In Line With CDM Regulations 2015

With recent changes in the Construction (Design and Management) [CDM] Regulations for 2015; companies undertaking construction projects now need to appoint a Principal Designer and the Client now has more responsibility.

The Client role is one of governance and they are required to ensure the Principal Designer and Principal Contractor perform their duties under CDM.

This is where FEG Ltd can assist clients with support from the start of a project to completion: a Cradle-to-Grave methodology. Under the role of Principal Designer FEG Ltd include the planning, management, monitoring of the project and coordination of matters relating to health and safety at the pre-construction phase.

The Principal Designer must have technical knowledge of the construction relevant to the projects, be involved in the decision process and ensure all other designers fulfil their obligations.

FEG Ltd’s unrivalled combination of skills and experience in Design, Project Management and CDM Regulations ensure Clients are given the best advice and support to deliver their projects.
Photo
Add a comment...

Post has attachment
FEG Ltd – Assisting Manufacturers with ESOS Assessments

All large UK businesses will be affected by the Energy Savings Opportunity Scheme (ESOS) regulations now in place.

FEG Ltd, specialist in providing Sustainable and Waste Heat to Energy Systems, is now offering ESOS Assessments enabling companies to comply with the regulations and how to take advantage of real Energy Saving Solutions opportunities.

FEG’s specialist engineers will act as your Lead Energy Assessor and will conduct an ESOS Assessment for you. This will measure your total energy consumption for buildings, industrial processes and where appropriate any transport, while identifying areas of significant energy consumption that account for at least 90% of your total energy consumption. As Lead Energy Assessor your dedicated FEG engineer will also provide a compliance report for you to submit to the Environment Agency in time for the 5th December 2015 deadline.

With energy being a significant cost to manufacturers and processing companies, the major benefit of such an ESOS Assessment is that FEG will also identify cost-effective energy efficiency recommendations for areas of significant energy consumption and can carry out Energy Improvement Projects.
Photo
Add a comment...

Post has attachment
Hygienic Washroom Facility for Food Factory Component Cleaning

Specialising in solving problems, FEG Ltd was commissioned to project manage the installation of a new Washroom Facility for cleaning food factory components that needed to be integrated strategically into the companies food manufacturing plant.

The Washroom Facility is of a compact design being 7m long x 3.5m wide. The new Hygienic Washroom provides a dedicated area for cleaning down factory components using dilute chemicals with a power washer. Racking is installed to allow drainage into a common floor channel, all drained into a system that discharges through an in line trap and into a controlled fat trap system, ensuring that no fat residue is discharged into the factory drainage system.

Two stainless steel Belfast sinks are employed to deal with smaller components using a hose wash to compliment the power wash facility.

The Washroom Facility has a hygienic resin floor enabling the area to be kept clean, complimenting the production facilities that are accessible through a fast acting door that allows fork lift truck access from the adjoining manufacturing plant.

The building is constructed out of hygienic composite panels attached to a stainless steel framework.
Photo
Add a comment...

Post has attachment
New Hygienic Flooring for United Biscuits Improves Storage Facility

FEG Ltd’s project management expertise has been successfully utilised by one of their food processing clients United Biscuits.

An existing area used as offices and later as a production area and more recently as storage for pallets of unpacked biscuits, the surface needed to be replaced and roof / ceilings needed repairing. The original timber finish had broken up due to water ingress and FLT (fork lift truck) traversing the areas.

The section of the floor to be removed was partitioned off to prevent dust and debris from damaging the product stored while production & packing continued. All the timber was removed from the first storey level, loaded into skips and responsively disposed of.

The concrete floor exposed area was mechanically roughened to allow an appropriate key to allow the multi stage floor system to be applied. Movement joints were built into the floor sections using hygienic material to minimise the risk of the floor being damaged due to fork lift truck traffic.

Because of FEG’s project management of the whole job, production and packing was able to continue uninterrupted over the two week programme. The new floor enables a bigger area to be used for storage and safety was greatly improved with the unevenness of the previous floor eradicated.
Photo
Add a comment...
Wait while more posts are being loaded