Profile cover photo
Profile photo
Shabani Engineering
8 followers -
Mechanical consulting engineering services for industrial and commercial projects.
Mechanical consulting engineering services for industrial and commercial projects.

8 followers
About
Posts

Post has attachment
Project - Rubber Dust Collection System with Cyclone Design
Timing belt manuf. - SC

• 36,000 cfm rubber dust collection and filtration system for more efficient dust removal of exist. lathe operation
• Designed custom cyclone design, hoods, ductwork system with centrif. exhaust fan and cartridge dust collector

More info:

https://shabani-engineering.weebly.com/rubber-dust-collection-system-with-cyclone.html
Photo

Post has attachment
Project: Double-wall PP-H drainage system
Pipe stress and support design
Lab building - PA

• Pipe stress - Thermoplastic PP-H double-wall drain piping at 120°F
• Load cases include standard thermal cycles and fatigue
• Designed pipe support layout, exp. loops and sealed drawings

More info:
https://shabani-engineering.weebly.com/double-wall-piping-system.html
Photo

Post has attachment
Project: Chemical Injection Skid Pipe Stress Analysis
BP offshore natural gas platform - Houston, TX

• Pipe stress analysis - High press. 6,700 psi
• Multiple load cases
• Specified pipe supports and created support detail drawings

https://shabani-engineering.weebly.com/chemical-injection-skid.html
Photo
Commenting is disabled for this post.

Post has attachment
Project: Process Pressure Vessel design/analysis
• 316L SS tank holding 200°F water at 14 psig
• Includes dimple jacket: 100 psig, 338°F sat. steam
​• Designed according to ASME Section VIII Div. 1

More info:
https://shabani-engineering.weebly.com/process-pressure-vessel.html
Process Pressure Vessel
Process Pressure Vessel
shabani-engineering.weebly.com
Commenting is disabled for this post.

Post has attachment
Project: UC Fellowship Hall
Charlotte, NC

• HVAC/Plumbing System for new 13,000 sq.ft. fellowship hall
• 41 tons total cooling using multiple split DX gas units
• Reduced outdoor air required using air purif. devices with ASHRAE 62 IAQP exception

More info:
https://shabani-engineering.weebly.com/uc-fellowship-hall---charlotte-nc.html
UC Fellowship Hall - Charlotte, NC
UC Fellowship Hall - Charlotte, NC
shabani-engineering.weebly.com

Post has attachment
Project: Designed Lift Platform for Turbine assembly
Facility in Saudi Arabia

• Designed platform to lift 3,000 lb total of people/equip. up to 20' max height
• Performed frame stress calculations
• Uses (2) 3,500 psi hydraulic rams and sprocket/chain system

More info:

https://shabani-engineering.weebly.com/lift-platform-for-turbine-assembly.html
Lift Platform for Turbine assembly
Lift Platform for Turbine assembly
shabani-engineering.weebly.com
Commenting is disabled for this post.

Post has attachment
Project: Defoamer equip. skid
Pipe stress anlaysis and support design
BP offshore natural gas platform Houston, TX

• Pipe stress analysis - High press. 2,010 psi
• Multiple load cases including sustained, operating, wind, seismic and blast
• Designed 3D model, provided fabrication iso. drawings (isogen) with BOM's
• Specified pipe supports and created detail drawings

More info:
https://shabani-engineering.weebly.com/defoamer-skid.html
Defoamer Skid
Defoamer Skid
shabani-engineering.weebly.com
Commenting is disabled for this post.

Project: Lawn Equip. Manuf. HVAC Addition (GA)
2015-2016

Designed new HVAC system addtions for several buildings.

• Building No. 2: 400,000 sq.ft.
• 440 tons addtional cooling using packaged RTU's with economizers and VFD's

Project detail:
https://shabani-engineering.weebly.com/lawn-eq-manuf-hvac-addition.html

Commenting is disabled for this post.

New projects added to our website under commercial HVAC projects.
http://shabani-engineering.weebly.com/projects.html
Commenting is disabled for this post.

Please see our website for latest project news.
Wait while more posts are being loaded