Our team completed a turn-key design, construction, and operation of a temporary HDPE waterline in support of oil and gas development in Tioga County, Pennsylvania.
In connection with the project, Keystone engineered and constructed a bridge crossing, using hanging devices to mount the 12″ HDPE pipe to a state highway bridge. The pipe was installed on the bridge during an overnight lane closure over a period of two hours. http://www.keystoneclear.com/news/elkland-hdpe-waterline
Shared publiclyView activity