Job Vacancy: Qualified Electrician

Due to continued growth, Welvent Ltd are recruiting for a full time electrician to work within our team.

Responsibilities:
- Electrical installations in the agriculture sector.
- Installation/Wiring of large 3 phase systems, general lighting and small power
- Installation/Wiring of VSD's from 1.5kw to 200kw
- Test & Certifying new & old installations.
- Adapting new control technology to old existing systems.
- Service & repair work

Requirements:
- C&G 2382-15 (17th Edition)

- NVQ Level 3 / AM2

- Previous experience with control panels, wiring schematics

- Capable at problem solving

- Flexible to be working away from home as work will be all over the country

- Ability to work overtime when necessary is important

- Ability to work on your own initiative

Hours/Salary:
- Wage is dependant on experience & capability
- 40hrs a week + overtime,Monday-Friday normal working days but weekends if required

Please message for further details or interest.
Add a comment...

Post has attachment
The gang are working hard today on a grain drying installation
PhotoPhotoPhotoPhotoPhoto
5/12/16
6 Photos - View album
Add a comment...

Post has attachment
Electrical Installation:
Ox Pasture Farm
Pheasant/Partridge Rearing Shed

Electrical installation completed by Welvent as follows,
- Excavation work for mains supply cable. Cable calculation and installation of mains cable up to 160amps 3 phase.
- Install underground ducting for networking, CCTV and electric gate controls
- Manufacture and install automatic mains/generator change over control panel.
- Install over 6000 metres of cable for heating and ventilation equipment back to control panel.
- GSM unit for control panel alarm, mains failure and generator start stop.
- Inspection, Testing, Commissioning and certifying installation.
- CCTV for pen viewing with remote live view from any smartphone.
- On a tight deadline which was met.
- Individual metering for sub supplies on site.
- 192 dimmable LED strip lights, specific to poultry rearing and complete with automatic sequence set points or manual remote control.
- Emergency lighting
PhotoPhotoPhotoPhotoPhoto
06/05/2016
13 Photos - View album
Add a comment...

Post has attachment
We have just installed our new wood pellet fed biomass boiler that provides 130kw of heat for our factory and offices
Photo
Add a comment...

Post has attachment
The new shape Ford Transit van with a bigger weight limit so we can carry more refrigerant on the road with us
Photo
Add a comment...

Post has attachment
Our order books are nearly full for the season so get your drive over floor order in soon if you want one of the last spots
Add a comment...

Post has attachment
Add a comment...

Post has attachment
New multipurpose store installed at Peterborough
Photo
Add a comment...

Post has attachment
PhotoPhotoPhotoPhotoPhoto
2013-07-18
13 Photos - View album
Add a comment...

We are going to the Storage Day held by the Potato Council at GH Chennells (Farms) Ltd today. Keeping up to date with all the latest developments in Potato Storage
Add a comment...
Wait while more posts are being loaded