Profile cover photo
Profile photo
Northern Escalator Installations LLP
5 followers -
Northern Escalator Installations LLP provide a comprehensive installation and commissioning service, covering a wide variety of leading manufacturer’s machines including the likes of Otis, Kone, Schindler and ThyssenKrupp, to name a few
Northern Escalator Installations LLP provide a comprehensive installation and commissioning service, covering a wide variety of leading manufacturer’s machines including the likes of Otis, Kone, Schindler and ThyssenKrupp, to name a few

5 followers
About
Northern Escalator's posts

New Project Manager Matt Hattley at Northern Escalator Installations LLP

Northern Escalator Installations LLP (NEILLP) is pleased to announce Matt Hattley as the newest member of its project management team.

Matt comes with extensive lift industry experience and commercial expertise, and it is anticipated that his role within the team will include the building up of the lift installation aspect of NEILLP’s business.

Kevin Johnson Managing Director said:
"Matt is a talented and enthusiastic project manager, and we wish him every success in his new role at (NEILLP).”

Post has attachment
Project Completion at London Bridge Station

Northern Escalator Installations LLP (NEILLP) has recently completed one of its largest prestige escalator installation projects on behalf of Kone PLC at London Bridge; the fourth busiest station in the country, which is part of a £6.5bn London Bridge redevelopment program. The station brings around 54 million passengers into the city each year.

Northern Escalator Installations LLP began the project in 2015 to install 26 new escalators, with the completion of the final two units in June 2017.

At peak times, more than 16,000 passengers an hour will travel down escalators from the platforms to this vast open area, the size of the pitch at Wembley stadium, connecting to new destinations.

London Bridge is a central London railway terminus and connected to London Underground station in Southwark, occupying a large area on three levels immediately south-east of London Bridge and 1.6 miles (2.6 km) east of Charing Cross.

The main line station is the oldest railway station in London fare zone 1 and one of the oldest in the world, having opened in 1836. It is one of two main line termini in London to the south of the River Thames, the other being Waterloo.

London Bridge Station will fully reopen in January 2018; with improved facilities and two-thirds more space for passengers.
Photo

Post has attachment
Northern Escalator Installations LLP European Projects Update

A busy time in Europe at Northern Escalator Installations LLP, April 2017 saw removal and installations on all fronts, with four escalators installed at Strängnäs station Sweden, replacement of two escalators at Farsta station Stockholm; and the removal and installation of two escalators at Auber station Paris.
Photo

Post has attachment
Northern Escalators GmbH French Experience

02/01/2017

Northern Escalators GmbH, the German sister company of Northern Escalator Installations LLP, is proud to announce significant installation contracts acquired with Schindler Group at two major developments in France. The first contract is with Régie Autonome des Transports Parisiens (RATP) the state-owned public transport operator responsible for most of the public transport in Paris and its surrounding Île-de-France region including the Paris Métro, tram and bus services and part of the Réseau Express Régional (RER) network. The Escalator installation project is part of a scheduled 400 new and replacement escalators to be installed over the next five years within the Paris Métro, starting with a planned 40 replacements and 20 new escalators for 2017. Schindler have also agreed a second contract of 30 escalators planned for the Rennes Metro in 2017, with installation work on all units beginning in December 2016. Rennes is a vibrant University City and Brittany’s administrative capital. All installation work includes transportation of escalators to site, full build up, testing and commissioning of escalator units by our qualified team of field engineers.
Photo

Post has attachment
Scandanavian Expansion at Northern Escalators GmbH

02/01/2017

With continued demand for Northern Escalators GmbH (NE GmbH) services throughout Europe, the parent company Northern Escalator Installations LLP (NEILLP) has taken the strategic decision to open a dedicated office base in Stockholm, to service the Scandinavian market sector of Sweden, Denmark, Norway and Finland. The new Stockholm base will be known as Northern Escalators AB, and will enable (NE GmbH) to service customer requirements more effectively within this region. Niyazi Yildiz has been appointed Managing Director of Northern Escalators AB, and the new division of (NE GmbH) is officially operating from 1st December 2016. Kevin Johnson Group Managing Director (NEILLP) said “For over 20 years Northern Escalator Installations LLP has built a highly successful and well respected installation and commissioning service for the leading escalator and elevator manufacturers such as: Otis, Kone, Schindler and ThyssenKrupp .Having two permanent bases in Europe (Germany and Sweden) gives us a strong logistical and competitive advantage when servicing our clients”.
Photo

Post has attachment
Danny Newton Operations Co-ordinator

02/01/2017

Northern Escalator Installations LLP (NEILLP) is delighted to announce the appointment of an Operations Co-ordinator within their transport division.
Danny Newton will be responsible for the scheduling and co-ordination of escalator installation haulage throughout the U.K. and Europe. Danny comes with a strong haulage and transportation background; for the previous twelve years he has worked as a transport manager for a local freight company involved in storage, haulage and distribution.
A keen dog lover, away from work Danny and his wife are volunteers with Greyhound Rescue and Greyhound Rescue Awareness.
He enjoys all sport; in particular football and cricket, and has just begun to take up golf again. Gareth Judson, Operations Director (NEILLP), said "Danny brings with him significant commercial haulage planning expertise, he is enthusiastic with a good work ethic attitude, and we wish him every success in his new role."


Photo

Post has attachment
Northern Escalator Installations LLP Achieve Full Membership of the Lifting Equipment Engineers Association (LEEA)

17/02/2017

Northern Escalator Installations LLP (NEILLP) has achieved full membership to the Lifting Equipment Engineers Association (LEEA), the leading representative for companies involved in the lifting industry worldwide, and the respected authoritative body for organisations who work in every aspect of the industry, from design, manufacture, refurbishment, repair, through to the hire, maintenance and use of lifting equipment. Membership of (LEEA), compliments (NEILLP) existing ISO 9001:2015, ISO 14001:2004, ISO: 18001 certification held by (NEILLP). Northern Escalator Installations LLP Lifting Equipment Manager Richard McCourt said “Full membership of (LEEA) is part of our commitment to continuous development of all our quality standards, as the definitive approved code of practice for the lifting equipment industry.” Northern Escalator Installations LLP commitment to best practice quality management classifications, is demonstrated in the trust and confidence reciprocated from our client base of global brand manufacturers within the escalator and elevator market sector, in the provision of outstanding high quality service. The Lifting Equipment Engineers Association (LEEA) is also the industry voice for its members and represents the lifting equipment industry at the highest levels, including UK, European and international standards organisations, government departments, the UK Health and Safety Executive and certification bodies.
Photo

Post has attachment
Northern Escalator Installations LLP - Major Scenic Elevator Installation at London Commercial Development Project

Northern Escalator Installations LLP (NEILLP) has recently been awarded the contract to install eighteen bespoke architectural scenic elevators for a major commercial development project, at Bloomberg buildings in central London.

The project includes Northern Escalator Installations LLP transporting the consignment of elevators from Finland, via its own dedicated specialist transportation fleet, on behalf of Kone plc.

Full testing of all elevators will be undertaken at our purpose built testing rig facility prior to transportation, installation, and commissioning of this project at the London location.

Gareth Judson (NEILLP) Operations Director said: “This is a significant logistical operation in terms of transporting such a valuable consignment of elevators across Europe. I am delighted that our team of dedicated personnel, and the quality management systems which we strive to implement, will enable us to deliver this project successfully and on time, demonstrating the high level of quality service we give to our clients”.

www.northerninstallations.co.uk


Photo

Post has attachment
Northern Escalator Installations LLP at Prestige Office Development Minster Court London EC3

Northern Escalator Installations LLP (NEILLP), the escalator installation and removal specialist, has recently completed a major project to remove sixteen escalators from the prestigious office development at Minster Court London EC3, on behalf of 777 Demolition Ltd.
The removal project included a range of specialty services undertaken by NEILLP, from feasibility and site surveys, to advising the customer prior to any works being carried out, consulting with builders and architects, producing detailed RAMS, supplying transportation and cranage for the escalators being removed, through to gaining authority for road closure and arranging traffic management where necessary.

A dedicated Project Manager was appointed at the beginning of the work to be our customer’s point of contact, throughout the whole of the removal operation.

The removal of the escalators took approximately four weeks from the start of the project to completion.
Minster Court is built on the site of what was an ancient convent around 1,000 years ago, which is the source of inspiration for much of the Post-Modern Gothic architectural building design.

Minster Court was the headquarters of the London Underwriting Centre, one of the main hubs of the financial services industry in London. At its peak the building handled 3500-4000 brokers a day

The full completion of the Minster Court refurbishment will see this iconic building transformed into modern open plan office space.

www.northerninstallations.co.uk



Photo

Post has attachment
Northern Escalator Installations LLP - Proud Involvement in Crossrail at Paddington Underground Station
A Modern Take on a Victorian Icon

Northern Escalator Installations LLP is proud to be involved in the London Crossrail Underground project, and to have won the 1.5 million pound contract to install 15 escalators at the new Paddington station on behalf Otis Ltd, the world's largest manufacturer of people-moving products, including elevators, escalators and moving walkways.

The Crossrail Paddington Station is being built directly below Departures Road and Eastbourne Terrace and will offer a superior travelling experience with smoother interchanges and improved accessibility, easing congestion and providing space for future growth in passenger numbers.

Originally built in 1853, it is the design legacy of Isambard Kingdom Brunel and the architect Matthew Digby Wyatt. The new Paddington station is a modern take on a Victorian icon!

Built to the south of Brunel’s iconic 19th century station, the new station spans three levels with two entrances into the station via a new pedestrianised zone.

The station will take the form of an underground box measuring 260m long, 25m wide and 23m deep.

As passengers descend into the station via escalator or lift, the station box is lined with flush-jointed brick, perforated in places for acoustic absorption. Other materials are equally durable; glass, bronze and anodised aluminium, plus the stainless steel of the common components such as the escalators.

The construction of the station which started in October 2011 is due for completion during 2017.

www.northerninstallations.co.uk


Photo
Wait while more posts are being loaded