Profile cover photo
Profile photo
Integrated Flow Solutions LLC
6 followers
6 followers
About
Posts

Post has attachment
Do you know the answers to these questions about electric process heater safety? You should. 
Add a comment...

Post has attachment
There are five modes of electrical process heater failure to avoid when specifying an EPH. See how to avoid them here. 
Add a comment...

Post has attachment
Check out our new blog post to learn all about SCR DeNOx, Balance of Plant (BOP) and Fuel Gas Conditioning modules.
Add a comment...

Post has attachment
Check out our 9 reasons why modular construction is superior to stick-built.
Add a comment...

Post has attachment
After IFS was contacted regarding for a "quick ship" crude oil pipeline station for the Cusiana field, they found that the client had damaged the equipment. IFS supervised the complete disassembly/reassembly of the piping system pump, returning the pump to its original remanufactured condition.
Add a comment...

Post has attachment
IFS was contacted regarding the need for a crude oil pipeline station in 12 weeks. Typical turnaround is one year.
Add a comment...

Post has attachment
IFS has updated and posted the “2015 IFS Company Profile” to the IFS website.
Add a comment...

Post has attachment
IFS designed a fuel gas membrane conditioning package to remove natural gas liquids from a natural gas stream produced onshore in Africa.

http://ifsolutions.com/blog/fuel-gas-membrane-conditioning-package/
Photo
Add a comment...

Post has attachment
IFS participated in the POWER-GEN International exhibition held at the Orange County Convention Center in Orlando Florida December 2014.
Add a comment...

Post has attachment
IFS supplied a skid-mounted, prepackaged, tested Instrument Air and Nitrogen Generation system for use by Shell Iraq Petroleum Development (SIPD).

http://ifsolutions.com/blog/air-nitrogen-generation-system/
Photo
Add a comment...
Wait while more posts are being loaded