The $2.5 million “Cooranbong WWTP Project” facility will purify waste water from kitchens, bathrooms and toilets, then pump it back to selected taps for use in toilets, washing machines or outdoor areas.

The bioreactor tank is 25000 x 13000 and 6000 high. It has a Class 2 finish as was required, using Super Slim Soldiers with conventional LVL secondary beams and brand new ply face, all sourced from RMD Newcastle Branch. To cut costs Slimshor raking shores used for external walls were recycled for the internal walls.
Photo
Add a comment...

Post has attachment
RMD Adelaide are proud stockists of Ox Tools, please follow this link to see some of their bonus offers:
http://rmdmicro.com/support_items_flyers.html
Photo
Add a comment...

Post has attachment
RMD Darwin supplied Slimshor propping for Darwin’s Gateway Shopping Centre project

RMD Darwin supplied Slimshor propping to All Cast NT for Darwin’s Gateway Shopping Centre project. Slimshor was used to support precast panels at a height of 9.5m. The main construction constraint or problem encountered by the client was a large void directly in front of the precast panel landing area resulting in a required raker length in excess of 15m. This fact ensured that regular precast propping systems wouldn’t meet the brief, but with the help of the RMD design team and RMD’s ever versatile Slimshor product, support of these panels was achieved with ease.

http://rmdaustralia.com.au/products/slimshor-2/

#Darwin, Northern Territory
Photo
Add a comment...

Post has attachment
An Adelaide house owner required a class 2 finish for all of the walls in the house and basement because he plans to leave all of the walls exposed.  To help create the best possible finish Faraone Constructions decided to use 17mm F14 Plywood, Superslim Soldiers for their extra support and 95 x 65 timber wales. The walls ranged in height from 2.7m to 3.0m.  The entire job was formed and poured in one go.  Both the client and the owner were very pleased with the RMD Adelaide system supplied.

http://rmdaustralia.com.au/projects
Photo
Add a comment...

Post has attachment
UTAS NRAS high-rise project in Hobart - Stage 1 involves the supply of approximately 3,500m2 of RMD’s Airodek, which will be cycled. Also the Alshor Plus shoring system will provide support to the band beams and edge supports. Alshor Plus Legs have been used as back props to release other equipment for use elsewhere whilst the slab concrete cures. Alshor Plus with Deck Beams and panels cantilevered over the edge removes the need for support from the ground and allows for safe access to the slab edge.

http://rmdaustralia.com.au/projects/
Photo
Add a comment...

Post has attachment
Clemton Park Village 

The versatility of the Rapidshor system allowed for three different types of cantilevered edge protection that allowed Westform Contractors to continue forming slabs right up to the edge, without the need to form the edge of the slab using additional high strutting shoring or pour the lower slab immediately next to the slab being formed.
Photo
Add a comment...

Post has attachment
PWCS - Gantry Support Carrington, Newcastle

The project is called PWCS - Gantry Support Carrington, and RIG Installations are our customer. The towers are to support a 40 year old coal conveyor gantry that is still in use but requires some major remedial work to keep it in service. The photos only show the first tower. There are another two towers of lower height to support the gantry as it slopes down towards the ground and feed conveyor.

This job was discussed, reviewed, designed and supplied within one week thanks to the efforts of the Sydney design team, Head Office design, plus the crew in Newcastle. 

#newcastle  
Photo
Add a comment...

Post has attachment
Children’s Hospital Perth

Perth Children’s Hospital is the new home for staff and services from Princess Margaret Hospital in Subiaco, providing specialist paediatric care for the children and adolescents of Western Australia. RMD Australia’s Perth Branch was involved in a number of different aspects of the Perth Children’s Hospital construction.

RMD  supplied the new Ascent-Formwork guided climbing system to John Holland, who used the system in crane assisted mode to form two stair cores and two lift cores. The largest core formed using the Ascent system measured some 21 x 8.0m in plan and was climbed vertically through 59m with each ‘floor to floor’ pour requiring approximately 107m³ of concrete.

The Ascent-Formwork system was chosen for its Safety features and benefits such as the ability to climb the Ascent system through multiple lifts, whilst remaining securely attached to the permanent structure and access for all trades inclusive of stretcher rescue capability, were key strengths of the Ascent-Formwork system .

http://www.rmdkwikform.com/au/projects/perth-childrens-hospital/
Photo
Add a comment...

Post has attachment
Reflex used to Constructs Two Sewer Pump Tanks

The Zuccoli Sewer Pump Station Dry/Wet Well was constructed by MK Construction Services to deal with the wastewater that will be generated in the new Zuccoli suburb in Darwin. This circular Dry/Wet Well has an internal radius of 4.5m and a wall thickness of 0.3m. It is 8.7m high and was constructed in 4 pours utilizing 2.4m panels from the Reflex curved wall formwork system in jumpform mode….

http://www.rmdkwikform.com/au/projects/reflex-constructs-two-sewer-pump-tanks/
Photo
Add a comment...

Post has attachment
Roy Hill Project

RMD Perth won the supply of the Roy Hill Rom (Run of Mine) Wall section of the project with Whittens Group. RMD delivered a simple, quick formwork solution with a high quality finish, by using Super Slim Soldiers and Alform Beam wales which enabled large formwork shutters to be constructed. The ROM walls are each over 90m long and 15.8m high at the highest point. Due to the height of the walls they had to be constructed in two lifts, the conventional forms were jumped using anchor screws.

Also RMD was involved in the Car Dumper on Package 3, Port Landside, where the RMD Alshor Plus shoring system was used for supporting the slabs formed with Ply, Albeam and Alform Beam tables lifted into position. The Alshor Plus shoring system is an innovative system, with integrated safety and productivity features.