We are rehabilitating this channel on Kuykendahel Road to eliminate the erosion on the side slopes and back slopes, remove all silt deposits in the bottom of the channel and restore the flow line. In addition, we are preserving all existing wet land.
Photo
Add a comment...

Post has attachment
Breckenridge Forest Section 13 is under construction! Van De Wiele & Vogler, Inc. is providing construction management and design services for this roadway tie-in to an expanded portion of Birnamwood Boulevard.
Photo
Add a comment...

Post has attachment
Forest Village Section 9 is substantially complete! 3,460 LF of water line, 3,362 LF of sanitary sewer pipe, 3,225 LF of storm sewer pipe, and a 6” concrete paving was designed and constructed for this residential subdivision in Montgomery County, Texas.
Photo
Add a comment...

Post has attachment
Unit K165-00-00 is substantially complete! The project included design and construction management of storm sewer outfall repairs for HCFCD Unit K165-00-00. The project included repairs of existing retaining walls, pipes, and headwall due to sinkholes.
Photo
Add a comment...

Post has attachment
Happy Professional Engineers Day!
Photo
Add a comment...

Post has attachment
This 89’X9’ Pedestrian bridge was constructed out of recycled railcars. It was built over a HCFCD ditch to provide access to park trails for residents. The existing sidewalks were extended to the bridge and were designed to match ADA and TDLR compliance. The bridge was completed in April.