Aldgate Tower

09.08.13

Level 2 completed - Installation of approx 2200m2 Comflor cf80 1.2 gauge, 800lm edge trim and 800lm toe board, 5000 19x120 shear studs installed.

Contact matthew@swuk.net for all supply or installation of complete composite flooring packages
Photo
Add a comment...

Post has attachment
Aldgate Tower - Progress 01.08.13
3 weeks into the project and Mezzanine Level and First Floor completed
6000m2 Comflor 80 Steel Decking installed including safety netting
800 lm Edge Trim including Facetted and Toe Board
7000 19x120 shear studs installed

Please click on the timeline video for more information

http://www.aldgatetower.net/
Photo
Add a comment...

Post has attachment
Aldgate Tower - Progress 01.08.13
3 weeks into the project and Mezzanine Level and First Floor completed
6000m2 Comflor 80 Steel Decking installed including safety netting
800 lm Edge Trim including Facetted and Toe Board
7000 19x120 shear studs installed

Please click on the timeline video for more information
Add a comment...

Post has attachment
Holorib equivalent steel decking stockists, click on the link to view our full range of products and services that we offer
Add a comment...

Post has attachment
Metfloor 60 Steel Decking loaded ready for a same day delivery to new steel fabricator clients in Guildford.

Steel Decking, Edge Trim, Shear Studs, Fixings and Reinforcement Mesh contact matthew@swuk.net or enquiries@swuk.net for any steel composite flooring requirements

www.swuk.net
Photo
Add a comment...

Post has attachment
Billingtons Structural Steel report trading ahead of expectations.

SWUK Steel Decking are pleased to read this morning that one of their preferred steel fabricator clients are trading ahead of expectations for 2013.

WIth over 30,000m2 of TATA Comflor 51, Comflor 60 and Comflor 80 installed already this year for Billingtons this is a positive step for all concerned.
Add a comment...

Post has attachment
Stockists of all types of Steel Decking Edge Trims - available same day or next day delivery.

Call 01335 347637 or email enquiries@swuk.net for further information
Photo
Add a comment...

Aldgate Tower started - 38,000m2 Comflor 80 1.2gauge steel decking to be installed by SWUK Steel Decking installers

Over 122,000 19x120 shear studs to be installed by SWUK stud welding installers

Click on the link below to check out our onsite progress over the next few weeks  

http://www.aldgatetower.net/