We have launched our brand new website.

Check it out!

https://accentconstruction.co.nz/
Accent Construction Interiors Ltd
Accent Construction Interiors Ltd
accentconstruction.co.nz
Add a comment...

Post has shared content
Our fully equipped joinery factory is ably managed by Warren Newman with over 30 years experience in joinery and cabinet-making.

Among our crew of 7, our four longest serving team members have in excess of 140 years experience between them, all of this experience goes into making the highest quality cabinetry and joinery items for your next project.

As well as this, our factory is equipped with a state-of-the-art CNC Machine, giving us even more scope to create unique 1-off pieces to make your next project or fitout special. 

Our in-house joinery factory supplies cabinet making and specialist items both for our own contracts and independently. Our factory is equipped with a diverse range of tools and machinery, which are maintained and serviced regularly.

Accent’s fully equipped factory and machine shop offers:

Design and build capability for unique and complex items
CAD and 3D modelling for design concept and presentation
CNC capability for one-off, complex shapes and multiple runs of special items
Special expertise in creating complex and curved shapes
Corian specialised resin worktops

The primary function of the factory is to design and build unique, custom made cabinetry, display and design features and any other special items that may form part of a project.  Warren's attitutde is, that if something can be done, he will find a way to do it.  In fact, the more challenging the concept, the more Warren & the team thrive on bringing that concept to life.
PhotoPhotoPhotoPhotoPhoto
Joinery
6 Photos - View album
Add a comment...

Post has attachment
Our Construction division were appointed as Head Contractor for the construction of a new factory of Marua Road, with road-side elevated offices.
PhotoPhotoPhotoPhoto
The Butler Factory - 178A Marua Road
4 Photos - View album
Add a comment...

Post has attachment
Our Construction division were the Main Contractor for construction of this showroom, office, warehouse development comprising a total floor area of 6000m2.

Works included excavation and site development, asphalt carparking, driveway works, structural steel, roofing, cladding, canopies, mezzanine floors, etc.
PhotoPhotoPhotoPhotoPhoto
Ballandean Properties Ltd - 20-24 Lambie Drive - Business Park
7 Photos - View album
Add a comment...

Post has attachment
Our Construction division were the Head Contractor for this large industrial development at 525 Great South Road, comprising of multiple showroom/ office / warehouse developments including extensive excavation work, site development and an underground carpark.

This project really demonstrates our experience and capability to construct & project manage large-scale industrial developments, from site excavation all the way through to the interior office fitouts for various tenants including Hilti and Daikin.

Check out the slideshow to see how it all came together.
PhotoPhotoPhotoPhotoPhoto
The Trade Centre - 525 Great South Road
11 Photos - View album
Add a comment...

Post has attachment
Stage 1 included Plumbing, Electrical, Mechanical, Fire Sprinkler & Alarm Systems, Data & Security, along with Interior and Exterior Linings, Floor & Wall Tiling, Doors, Cabinetry, Insulation, Toilet Partitions, Specialised Floor toppings, Glazing and both General Sanitary hardware.  Along the way, additional work was requested for other areas such as; corridor refurbishment, carpet and rubber flooring, insulation & fire door installation.  The project was carried out with minimal disruption to passengers, tenants and Auckland Airport while working in with specific timings for various tasks to suit flights and operations.

Gate Lounge Works
Management of both Gate Lounges 9 & 10 Security, while the Carpets, Seating and Departure Desk were replaced - Staged Hoarding.  The construction of new Departure Desks and Barrier Glazing and management of Electrical & Data installation to Desks.

Toilet Block Works
The demolition and rebuild of a new Toilet Block including Men's, Women's & Disability units. Works carried out involved: Plumbing, Electrical, Mechanical, Fire Sprinkler & Alarm Systems, Data & Security, along with Interior and Exterior Linings, Floor & Wall Tiling, Doors, Cabinetry, Insulation, Toilet Partitions, Specilised Floor toppings and both General & Sanitary Hardware. The project was carried out with minimal disruption to passengers, tenants and Auckland Airport while working in with specific timings for various tasks to suit flights and operations.

Management of Gate Lounges 4A - 4D security, while the Carpets, Seating and Departure Desks are replaced.  The construction of new Departure Desks and Barrier Glazing and management of Electrical & Data installation to Desks.  Replacement or Cleaning of general lighting and Clean all Mechanical Grills.
PhotoPhotoPhotoPhoto
Airport Facilities
4 Photos - View album
Add a comment...

Post has attachment
Construction of new multi-storey college from base-build through to interior fitout.
Photo
Photo
Nauru College - Denig
2 Photos - View album
Add a comment...

Post has attachment
Main contractor for the refurbishment of one of the main Hotel's on Nauru, for an upcoming Pacific Forum.
PhotoPhotoPhotoPhotoPhoto
Menen Hotel - Nauru
5 Photos - View album
Add a comment...

Post has attachment
This was a design & build project for a new Parliament House for the Nauruan Government.  From Base-build to interior fitout.
Photo
Photo
Nauru Parliament House
2 Photos - View album
Add a comment...

Post has attachment
Background
Accent’s brief was to fit out a brand new, fully functional, state-of-the art dental surgery in a new building of prestige healthcare providers. The project included making sure the two operating theatres complied with council codes as well as Health Department requirements.
 
Special features and challenges
We worked closely with Codri Luyk of Hauraki Design for an overall look that reflected the surgery’s prestige location.
 
The surgery was fitted out on an unoccupied floor of the already completed building. We installed two heavy dentist chairs, a heavy duty steriliser, X-ray machine with operator’s viewing area and televisions for close-up work. The dentist chairs, each weighing xxxkg, had to be lifted into place by crane (no mean feat when the building was already enclosed). And the cutting-edge X-ray machine, imported from Australia, was one of the first of its kind installed in New Zealand.

The job also involved specialised plumbing; for the mouth rinse bowls, healthcare standard hand washing facilities and the heavy duty steriliser which required boiling water to be reliably delivered every time.

The job was completed on time, to council and Department of Health standards and within budget – and the Luyks were thrilled with how Accent Commercial Interiors brought their ideas to life.