Profile cover photo
Profile photo
Tensa
11 followers -
Your Challenges, Our Solutions
Your Challenges, Our Solutions

11 followers
About
Posts

Post has attachment
Public
TENSA live from the 16th WCEE - World Conference on Earthquake Engineering in Santiago, Chile.
Photo
Add a comment...

Post has attachment
Public
From January 9th to 13th you can find us at the 16th WCEE - World Conference on Earthquake Engineering in Santiago, Chile. For more details click on the link below.
Add a comment...

Post has attachment
Public
New Certificate of Constancy of Performance for our Tens Frame Bending (TFB) devices obtained!

Congratulations to all the team members for their hard work!
Photo
Add a comment...

Post has attachment
Public
"Analysis of the structural behaviour of saddle systems for stay cables is complex and involves several co-dependent factors. Tommaso Ciccone, Francesco Moraglia and Andrea Castiglioni explain..." - Bridge Design and Engineering - Fourth Quarter 2016 pp.64-65
Photo
Photo
15/12/16
2 Photos - View album
Add a comment...

Post has attachment
Public
Second important ISO certification obtained in just one week!
#ISO14001 #EnvironmentalManagementCertification
Photo
Add a comment...

Post has attachment
Public
Add a comment...

Post has attachment
Public
Thanks to everyone who stopped by our booth at Congreso Nacional de la Infraestructura in Cartagena de Indias, Colombia last week.
Photo
Photo
27/11/16
2 Photos - View album
Add a comment...

Post has attachment
Public
A new and important goal achieved!

TENSA has recently obtained the OHSAS 18001:2007 - Occupation Health and Safety Assessment certification.

Congratulations to all the team members for their hard work!
Photo
Add a comment...

Post has shared content
LIVE FROM CONSTRUCTION SITES - Qatar - Doha - Red Line North

DEAL SETS A NEW RECORD!
CONSTRUCTION OF A 52-METERS SPAN WITH U-SHAPED SECTION AND USING SPAN BY SPAN METHOD.

DEAL has recently completed erection of a 4-span continuous deck unit composed of 4 spans having length 34+52+52+30m.
In order to erect this unit, DEAL has pushed to the limits the span by span methodology along with the relevant erection equipment to reach this goal for the first time ever in this kind of structures.
Compared to the traditional methods (i.e. balanced cantilever), cost benefits have been achieved by the innovative solution too.
PhotoPhotoPhotoPhoto
18/11/16
4 Photos - View album
Add a comment...

Post has attachment
Save the dates!
Photo
Add a comment...
Wait while more posts are being loaded