Cabbage Tree Point Dredging Kicks Off
Cabbage Tree Point Dredging and Beach Nourishment 2016
http://www.neumanncontractors.com.au/…/cabbage-tree-point-d…
Dredging has commenced in the Main Channel North at Cabbage Tree Point. Approximately 15,700m3 of material will be dredged from the channel to a designed depth of -2.7m LAT. The sand will be placed on the foreshore at Cabbage Tree Point, adjacent to the channel.
The Cabbage Tree Point dredge site is located on the Main Channel North, north of Jacobs Well, and south of the Tabby Tabby Channel confluence, adjacent to the Cabbage Tree Point boat ramp. Immediately adjacent to the dredge area, land is developed for residential uses, and many of the lots with water frontage have private jetties extending into deeper waters to allow low tide use.
The dredge area begins approximately 15 m north of the Cabbage Tree public boat ramp, extending southwards for approximately 500m.
The works are required to maintain safe navigable depth within the Main Channel North, which has been impacted by significant sand deposition and shoaling. This channel forms the primary movement channel for vessels travelling between the northern and southern areas of Moreton Bay, and it is therefore important to maintain navigable depths under all tidal conditions. Due to build-up of sand, water depths within the defined navigation channel at low tide are reduced to under one metre in some areas. Beach nourishment for recreational amenity is the selected dredge material management option to improve the amenity of the foreshore and provide additional protection to land which has been subject to steady erosion.
The Cutter Suction Dredge,Nu Discovery will be used for this project. The Nu Discovery is a 200mm cutter suction dredge from the Nu Explorer series of dredges. The Nu Explorer series of dredges have been designed and constructed by Neumann Contractors to specifically suit the typical dredging conditions encountered in projects like the Cabbage Tree Point Dredging Project. There are three dredges in the Nu Explorer series that currently complement our fleet (total of 9 Cutter Suction Dredges):
Nu Explorer (original dredge in the Nu Explorer Series) has been working in the OTML Mine in PNG for the last two years,
Nu Discovery has recently completed works in the Iluka Boat Harbour and Entrance Channel Dredging project,
Nu Investigator, is the latest in the fleet and has just completed initial trials and testing at Neumann Contractors, Corridor Sands plant at Woongoolba.
Dredge 12,Nu Discovery is a 227kW (305hp) 200mm three wire cutter suction dredge. The dredge is capable of dredging up to 120m3 per hour (in optimal conditions), dredge to a maximum depth of 6.5 metres, and pump the material up to 1,200m in distance.
http://www.neumanncontractors.com.au/
Photo
Add a comment...

Post has attachment
TALLEBUDGERA CREEK DREDGING WORKS
Annual Dredging and Beach Nourishment Works have been Completed for 2016
http://www.neumanncontractors.com.au/news/2016-tallebudgera-dredging-all-wrapped-up
Neumann Contractors have completed the dredging works in Tallebudgera Creek for 2016. This year over 30,000 m3 of clean sand was dredged from the Tallebudgera Creek to replenish the sand on Burleigh Beach. The sand is pumped overland and released in the southern end of Burleigh Beach, near the Burleigh Beach Pavilion and spread up to 350m northwards.
Neumann Contractors have undertaken the dredging works in Tallebudgera Creek for many years now, and the works are an integral part of the Gold Coast City Council's program to maintain and replenish the sand on Gold Coast beaches.
The Nu Enterprise, a 250mm Cutter Suction Dredge, a land based booster pump and up to 1.8km of pipeline were used to complete the works.
Scope of Work
> Mobilisation to site at Tallebudgera Creek the The Nu Enterprise, a 250mm cutter suction dredge, 1 booster pump, 1.8 km`s 250mm poly pipeline. The pipeline is mobilised around the Gold Coast highway on Burleigh Hill.
> Dredging of over 30,000m3 of sand from Tallebudgera Creek.
> Pumping the sand through 1.8km of pipeline to Burleigh Beach.
> Beach nourishment works along approximately 250m stretch of Burleigh Beach.
Challenges
> Strict environmental limitations on noise and turbidity.
> Maintaining suitable access for the public at all times and working on very busy beaches which must have public access open at all time.
> Mobilising and demobilising the dredge pipeline on the main road 4 lane highway at Burleigh Hil.
The Nu Enterprise will now be towed to Currumbin Creek and commence dredging after the September School Holidays.
Add a comment...

Post has attachment
V1 Veloway Bikeway Update - August

Veloway Steel Truss Structures - Transported to Site
Our steel fabrication team has finished the bridge structure and loaded the first truss onto the transport.
The oversize transport was from our Currumbin Yard to Juliette Street in Brisbane and involved special transport gear, Pilots and police escorts.
More Info: http://www.neumanncontractors.com.au/news/v1-veloway-bikeway-update-august
Add a comment...

Post has attachment
Nu Compact Begins Long Term Works

http://www.neumanncontractors.com.au/news/nu-compact-begins-long-term-works

Neumann Contractors Wins Dredging Works at Sand Mine

Neumann Contractors cutter suction dredge ‘Nu Compact’ has commenced dredging at a well established sand mine in Victoria.

The mine owners will be operating the dredge 24/7 for a three year period, dredging raw material from the sand extraction areas for processing.

Prior to delivery on site the dredge underwent significant refurbishment. The refurbishment included a new engine, transmission and pump, with extensive upgrades and customisation to the hydraulic, electrical and control systems. The dredge also received a new and improved larger control room.

The Nu Compact is currently undertaking dredging on a continual 24/7 basis and is achieving the productivity and availability targets required.
PhotoPhotoPhotoPhotoPhoto
8/9/16
11 Photos - View album
Add a comment...

Post has attachment
Add a comment...

Post has attachment
NEW - Neumann Equipment Website
www.neumannequipment.com.au

Neumann Equipment has a brand new website showcasing the extensive range of equipment they design and manufacture. These include high quality products for the following industries:

Marine Industry: - Windlass Anchor Winches; Capstan Winches; Mooring Winches; Towing Winches; Tugger Winches; Dredge Winches; Barge Winches; Oceanographic Winches; Chain Jaws and Custom Marine Winches.
Commercial Fishing Industry: - Trawl Winches; Try Winches; Codend Winches; Windlass Anchor Winches; Console Windlass Winches and Custom Commercial Fishing Winches.
Mining and Industrial: - Diesel Hydraulic Winches; Multi-Purpose Winches; Lifting Winches; Hoisting Winches; Man-Riding Winches; Mine Winding Winches; Hauling Winches; Cable Handling Winches; Cable Drum Stands; Cable Drum Spoolers and Custom Mining & Industrial Winches and Equipment.
Dredging Equipment: - Nu Explorer Series Cutter Suction Dredges; Platypus C Series Cutter Suction Dredges; Booster Pumps; Jaden Dredge Cutters; Dredge Winches; Barge Winches; Custom Dredging Equipment and Dredge Overhaul & Refurbishment.
Neumann Equipment is a leading Australian manufacturing company providing design and manufacturing services to the Marine, Commercial Fishing, Mining & Industrial and Dredging Industries, both in Australia and Overseas. With decades of industry experience, our highly qualified team of expert technicians have garnered a reputation for quality, professionalism and high industry standards. It is our focus to find the right product to suit your needs, at competitive market prices.

Neumann Equipment are proud to also manufacture and sell the trusted Rockcrush and Jaden dredges, winches and associated components. These leading brands have been an integral part of some of the country’s largest marine, civil and mining projects to date. As a distinguished dredge, winch and cable-handling equipment manufacturer in Australia we’ve achieved results that are second to none.

Neumann Equipment is a division of Neumann Contractors Pty Ltd.
PhotoPhotoPhotoPhotoPhoto
8/1/16
26 Photos - View album
Add a comment...

Post has attachment
Tallebudgera Dredging Ready to Start

The annual dredging program for Tallebudgera Creek is about to commence. The cutter suction dredge, the Nu Enterprise has been seatowed from the Broadwater and will start dredging soon.

This year an estimated 20,000m3 of clean sand will be dredged from Tallebudgera Creek and pumped up to 1.8 kms onto the beach at Palm Beach for much welcome beach nourishment.

Neumann Contractors have undertaken the dredging works in Tallebudgera Creek for many years now, and the works are an integral part of the Gold Coast City Council's program to maintain and replenish the sand on Gold Coast beaches. Each year around 20-40,000 m3 of clean sand and dredged from the Tallebudgera Creek to replenish the sand on Burleigh Beach. The sand is pumped overland and released in the southern end of Burleigh Beach, near the Burleigh Beach Pavilion and spread up to 350m northwards. The Nu Enterprise, a 250mm Cutter Suction Dredge, a land based booster pump and up to 1.8km of pipeline were used to complete the works.

Each year sand naturally travels northward along our coastline. Sand travelling across the entrance to Tallebudgera Creek can become trapped and cause infilling of the mouth of the creek. The trapped sand also contributes to the erosion on Burleigh Beach, which is just north of Tallebudgera Creek.

The Gold Coast City Council are committed to keeping Tallebudgera Creek in the best possible condition and in doing so can also help one of the Gold Coast greatest assets, Burleigh Beach. Without the annual beach nourishment program the extreme erosion problem could render the beach a hazard.

The dredging at Tallebudgera Creek and beach nourishment on Palm Beach will be finished prior to the September School Holidays.
PhotoPhotoPhotoPhotoPhoto
7/26/16
7 Photos - View album
Add a comment...

Post has attachment
Gold Coast Dredging Starts Soon

Neumann Contractors have been awarded the dredging contract for South Channel and South Wavebreak Island Channel Dredging 2016 project, on the Gold Coast, Queensland.

The works involve the dredging the nominated shallow areas of the primary South Navigation Channel and the secondary South Wavebreak Island Channel.

There is a total of 42,400m3 to be removed from the channels. There is 32,000m3 to be dredged from the South Channel in between the Seaway and Wavebreak Island. 8,700m3 from the South Wavebreak Island Channel and a further 1,700m3 from the South Channel adjacent to the Spit Finger.

he sand will be used to re-nourish eroded areas of beach on Wavebreak Island and also on the Spit Finger. Any surplus sand will pumped to Main Beach, just south of the sand pumping jetty.

The Cutter Suction Dredge Nu Endeavour has been sea-towed from Maroochydore to the Gold Coast. Mobilisation to site will commence next week and dredging is set to start late April.

Dredging works are expected to take 9 weeks.