Profile cover photo
Profile photo
Ultimate Gadget Laboratories
5 followers -
A startup that thinks outside the box
A startup that thinks outside the box

5 followers
About
Posts

Post has shared content

Post has shared content

Post has shared content
Both SMD and through-hole assembly have finished and now final assembly is taking place. The 50 UHKs of the pilot run are expected to ship next week!
Photo
Photo
12/7/17
2 Photos - View album
Add a comment...

Post has shared content
The through-hole assembly of the 50 pilot run UHK panels are proceeding apace, and expected to finish by the beginning of the next week. Final mechanical assembly will happen then.
Photo
Add a comment...

Post has shared content
Add a comment...

Post has shared content

Post has shared content
FCC was a smooth ride, but the ESD gun test of CE has given us a hard time. Luckily, we had resolved the issue and relaunched CE testing. We shall pass CE this time. CE is expected to be ready possibly on this week but not later than the week after the next one. Our PCBA contractor is eager to start production afterwards.
Photo
Photo
10/30/17
2 Photos - View album
Add a comment...

Post has shared content

Post has shared content
We received 3,000 UHK packages a couple days ago from the printing factory. Being preassembled boxes, they take up quite a lot of floor space. 15 pallets to be exact. Maybe we shouldn't go with preassembled boxes the next time.
Photo
Add a comment...

Post has shared content
Just got a short message from TÜV: "All FCC 15 ready and just PASS for Radiated Emission. Producing the report now" - Still waiting for the CE result and the official report, but so far so good!
Add a comment...
Wait while more posts are being loaded