Profile cover photo
Profile photo
SBS Group Steel Framing Solutions
3 followers -
Build Smarter with SBS Group
Build Smarter with SBS Group

3 followers
About
Posts

Post has attachment
The Marina Towers project is an impressive addition to Melbourne's skyline. Congratulations to builder Probuild Constructions, architect DKO Architecture and developer Hiap Hoe.

Here’s 9 more iconic projects in and around Melbourne over 20 floors that have used the system for an easier, faster and smarter hob formwork solution > http://ow.ly/gFXs30fl62M
Photo

Post has attachment
16m trusses? Not a problem.
3 semi's later and approx 60 of these 16m trusses were on their way yesterday to the Werribee Meeting House project...why just build when you can BUILD SMARTER?
Photo

Post has attachment
Stage 1 completed & Stage 2 underway - SBS Smart Frame columns and feature box framing manufactured to site specifications and delivered for immediate and easy install.

Project / Industria Knoxfield
Builder / C3 Constructions
Photo

Post has attachment
Installation of level 2 SBS Smart Frame walls well underway at 20A Cleveland Road, Ashwood. How does using cold formed steel framing systems help keep your project on time and on budget? Find out here > http://ow.ly/T7lm30fhwBn
Photo

Post has attachment
It may have been the first time the Smart Hob system was used for a distillery project but we hope it's not the last! Check out the case study of Starward Distillery here > http://ow.ly/2pd830ffKEu

Post has attachment
One smart light gauge steel framing solution - why coordinate and manage individual steel, timber and roof truss trades for the top level of your build when you can award just one contract?

Project / Spring Malvern by Pirovich Constructions.
Find out more > http://ow.ly/yg0k30ffGE7
Photo

Post has attachment
Manufacture of framing has commenced for Stage 2 of the Industria Knoxfield project. Full design, shop detailing and fabrication of light gauge steel facade feature frames by SBS Group for easier and faster on site construction.
Check out the full gallery of the completed Stage 1 here > http://ow.ly/qO3u30fal9d
Photo

Post has attachment
Just a few more wall and roof truss frames ready for delivery.
Why build on site when you can BUILD SMARTER off site? http://ow.ly/1BGn30f8zdc
Photo

Post has attachment
Installing the Smart Hob system is simple - watch this quick video to see the system in action > http://ow.ly/zgTP30f52w2
Photo

Post has attachment
Great to see the first frames up on site out at Spring Malvern.
Under construction by Pirovich, this apartment project is taking advantage of the SBS Smart Frame wall and roof truss framing system, cutting back on costly and unnecessary structural steel and timber materials > http://ow.ly/KUGw30f4Ypc
Photo
Wait while more posts are being loaded