Profile cover photo
Profile photo
OJ Pippin Homes
121 followers -
Building quality homes throughout South East Queensland
Building quality homes throughout South East Queensland

121 followers
About
OJ Pippin Homes's interests
OJ Pippin Homes's posts

Post has attachment
Structural Warranty, Certificates, and Guarantees
http://buff.ly/2mKVslf
Photo

Post has attachment
HOUSE OF THE WEEK #hotw
IDEALLY POSITIONED | Hemmant
http://buff.ly/2nchUQC
Photo

Post has attachment
Stage 7 - The tilers have now finished, all the cabinetry has been installed in the kitchen and bathrooms. The internal stairs have been fitted. Outside the rendering is completed and the upper level cladding is painted. To see all the previous stages go to: http://buff.ly/2nMcBId
Photo

Post has attachment
Friday funny! Like and share if this made you smile.
Photo

Post has attachment
Hot Suburbs within Brisbane. Check out this article now: http://buff.ly/2n2aCQ7
Photo

Post has attachment
Stage 6 - All the cabinetry in the kitchen is installed, the plaster has been sanded in preparation for painting and the tiler is starting to lay the main living area floor. To see all the previous stages go to:

Post has attachment
Friday funny! Like and share if this made you smile.
Photo

Post has attachment
What are the hidden costs when building a new home in Brisbane?
http://buff.ly/2nhzwOG
Photo

Post has attachment
HOUSE OF THE WEEK #hotw
NEW HOME IN HIGHLY DESIRABLE STREET | Salisbury
http://buff.ly/2nhFzmc
Photo

Post has attachment
Stage 5 - Carpenters have almost completed the external cladding on the upper level. Inside a lot is happening, the waterproof is done and the tilers are preparing the floors. Plasters have mounted the cornices. Cabinetry has arrived for the kitchen installation. To see all the previous stages go to: To see all the previous stages go to: http://buff.ly/2myRyLl
Photo
Wait while more posts are being loaded