Profile cover photo
Profile photo
Fullmer Construction
27 followers -
Building Relationships Since 1946
Building Relationships Since 1946

27 followers
About
Posts

Post has attachment
Add a comment...

Post has attachment
Add a comment...

Post has attachment
Add a comment...

Post has attachment
Add a comment...

Post has attachment
This one is cool. We recently completed a state-of-the-art steel pipe manufacturing facility for in Rialto, CA. The extensive operations area includes a vast array of intricate machinery, and is capable of producing up to 96" diameter pipes and fittings. Check it out!
Add a comment...

Post has attachment
Fullmer recently completed I-210 Logistics Center III for +Panattoni Development in Rialto, CA. The new 702,668 square foot distribution building is the first of three built for Panattoni simultaneously within a block of each other just off the 210 freeway. The project is LEED certified with the +USGBC (U.S. Green Building Council), and will operate as the new West Coast distribution center for Lifetime Brands. Check it out!
Add a comment...

Post has attachment
Add a comment...

Post has attachment
Century Distribution Center II is a beautiful new 201,027 square foot industrial distribution building located in Lynwood, CA. The new state-of-the-art spec warehouse facility was built for developer +Duke Realty, sits in the highly sought-after South Bay submarket and is Silver LEED certified with the +USGBC (U.S. Green Building Council) . Check it out!
Add a comment...

Post has attachment
We recently completed construction on the Slover Commerce Center, a new 671,557 square foot distribution building located in Fontana. The facility boasts a mammoth 40' clear height and features 98 dock doors. Click the link below to head over to the Fullmer website and check out the project:
Add a comment...

Post has attachment
Add a comment...
Wait while more posts are being loaded