Profile cover photo
Profile photo
Bayside Engineering Inc
1 follower
1 follower
About
Posts

Post has attachment
Construction continues on Route 97 in Groveland, Massachusetts. Based on the type of project, the methods Bayside’s design specified were able to pass along a cost savings of almost $200,000 to our client. Pictured is the Full Depth Reclamation (FDR) with Injected Asphalt Stabilization process. http://wp.me/p6NeBX-KM
Photo
Photo
6/29/17
2 Photos - View album

Post has attachment
We're thrilled to have Laura join our traffic engineering division. Please give her a warm welcome! http://www.baysideengineering.com/welcome-laura/

Post has attachment
Construction is set to begin in Gardner on Bayside's design of two pre-engineered steel buildings, a new 5,600 SF Office Building and a 14,000 SF Cold Storage Building. The $3.65 million project is expected to be completed by January 2018. http://wp.me/p6NeBX-h0
Photo

Post has attachment
Bayside’s Mike Rizzo attended the Worcester County Highway Association’s business meeting at the Cyprian Keyes Golf Club on April 18. The group networked and enjoyed presentations on the MassDOT Complete Streets Funding Program and Safe Work Zone Practices.
http://www.baysideengineering.com/worcester-county-highway-associations-business-meeting/
Photo

Post has attachment
Our very own Norman Brown continues as a MassDOT’s Owner’s Representative for this exciting project. Check out MassDOT's video illustrating the process.

https://www.facebook.com/massdotinfo/posts/1285036164913827

Post has attachment
Bayside Engineering is pleased to be working with CTA Construction Co. Inc. as they begin construction on the new Hurld-Wyman Elementary School in Woburn. http://wp.me/p6NeBX-JB
Photo

Post has attachment
Bayside would welcome the opportunity to assist you in MassDOT's Municipal Bridge Program application and design process due June 30, 2017. Learn how to apply. http://wp.me/p6NeBX-Jd
Photo

Post has attachment
Bayside Engineering was selected by MassDOT to redesign one of the most hazardous intersections in Massachusetts.

Post has attachment

Post has attachment
Pedestrian accessibility projects have been recently completed on Route 10 in Southampton and Route 9, North King Street in Northampton. http://wp.me/p6NeBX-Ft
Photo
Wait while more posts are being loaded