Little early am Sika balcony system going down for Fourth Elm Construction.
Photo
Add a comment...

Post has attachment
Dur A Flex Armor top done. This building completed onto the next one that Chris Williams has beast moded into submission.
Photo
Add a comment...

Post has attachment
Dur A Flex primer, SL down armor top in the am 27,000 sf. Products are super user-friendly. starting the next 30,000 feet tomorrow ahead of us. hashtag#teamwork
Photo
Add a comment...

Post has attachment
When the call comes we find a way and make it happen. Footing restoration and new grout pad. Ready for service. hashtag#restoration
Photo
Add a comment...

Post has attachment
One loading dock area ready to go for Monday. All I can say is I’m blessed with a great group of guys that have been pushing hard. They are the foundation for success and accountability.
Photo
Add a comment...

Post has attachment
60-year-old machine shop Floor that had more anchor bolts and pieces of steel protruding from the ground. Working our way out of the first 50k on to 30k prepped already then to the other three buildings. Kevin Stephens with the hands-on been to the site at least 5 times even got on the squeegee for a bit. Dur-A-Flex product is FRESH and very user-friendly. The 4 part urethane is super high quality. Of course Chris Williams on the prep ahead of us mowing it down with the Prepmasters! Total team effort I even got in on the 3030 for a few days. Very thankful to be working with such great leaders of an industry!
Photo
Add a comment...

Post has attachment
Necessity is the mother of invention.....have to love the Prepmaster however when you are tall you wish you were hobbit size to run these bad boys. In comes Mr. Wizard our extremely talented neighbor Joshua Hardison with some killer adjustable handles!
Photo
Add a comment...

Post has attachment
Prepatching completed, tons of metal studs addressed, joint reconstructions in progress, pre site visit from Kevin Stephens getting ready to install the Dur A Flex. First 50,000 sf. Final patching and grinding starting soon.
Photo
Add a comment...

Post has attachment
Brickform cemcoat bringing #concrete back to life. Ready for gemseal. Thank you Ross Urshan and Chris Greiner for the support as always. Samples down on to scheduling.
Photo
Add a comment...

Post has attachment
Full restoration with joint repair, #patching, using #epoxy primer, self leveler, and #urethane #topcoat we are prepping ahead of Chris Williams. Getting a jump while the rest move out and plastic comes down. Before pic first building 50,000sf. Game on.
Photo
Add a comment...