Profile cover photo
Profile photo
Aggreko Worldwide
155 followers -
Power Rental and Temperature Control
Power Rental and Temperature Control

155 followers
About
Aggreko Worldwide's posts

Post has attachment
We’ve delivered 95 MW in 120 days to Myamar to support local community needs. Watch our time-lapse video: http://bit.ly/1N2T2DA

Post has attachment
5 steps food processors can take to ensure optimal seasonal cooling: http://bit.ly/1D57fgI

Post has attachment
On any rental project fuel is a major expense. However, with gas, energy costs are dramatically reduced. Watch this video and learn more about the benefits of mobile gas power solutions: http://bit.ly/1fgiZCN

Post has attachment
Africa faces many economic and environmental challenges towards improving access to affordable and reliable power sources. Read more for Aggreko's view on how this can be addressed: http://bit.ly/1NF3Jde

Post has attachment
There are a lot of uncertainties in business, but power supply shouldn’t be one of them. Watch the video: http://bit.ly/1TwiLXu

Post has attachment
Aggreko has been accredited with the OHSAS 18001 : 2007 Occupational Health and Safety standard across all locations in the UK, Ireland and Nordics. Read more: http://bit.ly/1FijEZ0

Post has attachment
Aggreko appoints Dr Sixtus Mulenga as Zambia Chairman. Read more: http://bit.ly/1JMaL00
Photo

Post has attachment
We have launched our multi-megawatt Power Projects Division in Colombia. Read more: http://bit.ly/1QffJrC

Post has attachment
20 MW of power to the Las Bambas mine located more than 4,000 metres above sea level in Peru. Read about the project in more detail here: http://bit.ly/1HrCApK

Post has attachment
20 MW of power to the Las Bambas mine located more than 4,000 metres above sea level in Peru. Read about the project in more detail here: http://bit.ly/1HFrmAF
Wait while more posts are being loaded